Serenity Marina Club the main bridge is of reinforced concrete structure, and the branch bridge is of aluminum alloy structure. It was designed and constructed by lanzheng company, with a total number of 352 berths. It was completed on July 5, 2012.
目前还没有评价
您的电子邮箱地址不会被公开。 必填项已用*标注
您的评价 *
名称 *
电子邮件 *